What if older machines have no interfaces?
Begin with manual reporting and barcode scans, then add collection according to equipment capabilities. Direct integration with every machine is not promised.
Solution coverage
Work-order release and dispatch;
production and time reporting;
operation inspections;
equipment data-collection interfaces;
completion and cost write-back to BC.
Implementation and delivery
Operation and reporting design, an interface list, shop-floor SOPs and go-live support.
Implementation and delivery
Eight to sixteen weeks, depending on production lines and operation complexity; agree routings and reporting granularity first.
Scope and prerequisites
The package does not include advanced finite-capacity scheduling or predictive equipment maintenance; it does not replace BC production orders or costing.
Before you begin
Understand system responsibilities and implementation requirements.
Begin with manual reporting and barcode scans, then add collection according to equipment capabilities. Direct integration with every machine is not promised.
Use scans for simple operations and shop-floor terminals for processes with more operations or parameters. Both can coexist after reporting granularity is agreed.
Yes. Write labor time and scrap back to BC, with costs based on actual time and material use. Write-back can run by shift or day-end.
Talk to our team
Assess the right solution for your existing systems, business scope and implementation conditions.