Manufacturing and production: BOMs, routings and cost variances

Configuration essentials for BOMs, routings, MRP and cost variances.

Solution coverage

Capabilities

BOM levels and versions;

routings and operations;

MRP parameters including lot sizes, lead times and safety stock;

production-order status flow;

production reporting and WIP;

standard costs and variance analysis.

Implementation and delivery

Configuration checklist

Ten settings: BOM explosion, routing versions, subcontracted operations, material-consumption methods, reporting granularity, scrap treatment, WIP counts, costing methods, variance definitions and month-end sequence.

Scope and prerequisites

Scope and limitations

MES handles finite-capacity scheduling, equipment data collection, OEE and SPC; manufacturing requires Premium; avoid frequent changes to the costing method after go-live.

Before you begin

Frequently asked questions

Understand system responsibilities and implementation requirements.

How are BOM revisions tracked?

Create a new version with an effective date for each revision. Production orders retain the version used at release.

How are subcontracted operations costed?

Include the operation purchase price in cost, with freight and duties shown separately. Track rework after failed return inspection separately.

Can we use MRP suggestions directly?

No. Verify lot sizes, lead times and safety stock, review exception suggestions, and confirm manually before creating orders.