How are BOM revisions tracked?
Create a new version with an effective date for each revision. Production orders retain the version used at release.
Solution coverage
BOM levels and versions;
routings and operations;
MRP parameters including lot sizes, lead times and safety stock;
production-order status flow;
production reporting and WIP;
standard costs and variance analysis.
Implementation and delivery
Ten settings: BOM explosion, routing versions, subcontracted operations, material-consumption methods, reporting granularity, scrap treatment, WIP counts, costing methods, variance definitions and month-end sequence.
Scope and prerequisites
MES handles finite-capacity scheduling, equipment data collection, OEE and SPC; manufacturing requires Premium; avoid frequent changes to the costing method after go-live.
Before you begin
Understand system responsibilities and implementation requirements.
Create a new version with an effective date for each revision. Production orders retain the version used at release.
Include the operation purchase price in cost, with freight and duties shown separately. Track rework after failed return inspection separately.
No. Verify lot sizes, lead times and safety stock, review exception suggestions, and confirm manually before creating orders.