Who maintains inspection standards?
The quality department maintains inspection plans and acceptance standards, updating versions through engineering changes. The system executes these rules rather than replacing professional judgment.
Solution coverage
Inspection plans and acceptance decisions;
lot traceability;
nonconformities and rework;
equipment registers, checks, maintenance orders and spare parts.
Implementation and delivery
Inspection-plan templates, a traceability-flow diagram, equipment-register templates and training materials.
Implementation and delivery
Six to ten weeks, depending on inspection checkpoints and equipment numbers; provide quality-system documentation first.
Scope and prerequisites
The package does not replace BC fixed assets or depreciation. Calibration and metrology are assessed against the customer's quality system. It is not a laboratory LIMS.
Before you begin
Understand system responsibilities and implementation requirements.
The quality department maintains inspection plans and acceptance standards, updating versions through engineering changes. The system executes these rules rather than replacing professional judgment.
Customer and regulatory requirements determine the level: lots can link to raw-material lots, while individual tracking uses serial numbers. More detail increases data-entry effort.
BC handles asset records and depreciation; the equipment module handles checks and maintenance orders. Order costs are written back to assets and expenses.
Talk to our team
Assess the right solution for your existing systems, business scope and implementation conditions.